9 inch Form Flash

Main Image

Price: £18.63

An Elevate uncured form flash, laminated to a quickseam tape. 

• Provides a long-lasting watertight finish between your EPDM & other substrates, typically when flashing internal or external corner, pipes, penetrations & other awkward details. 

• Used in conjunction with Quickprime Plus, Quickscrub pad & handle. 

• Sold by the linear meter.

Please select an option from our range:

Please select a quantity:

  • SKU.27
  • Details
  • Application
  • FAQs
  • Deliveries
  • Downloads

Elevate 9 inch Form flash is a high performance, uncured formflash, factory laminated to Quickseam tape, it is self-seaming and relatively easy to install.

• Ideal for trade or competent DIY'er, Quickseam flashing is available to buy by the metre and is 229mm (9” wide) to suit a wide range of project types, regardless of size.

• It boasts a wide range of benefits:

Long-term performance  -  Ideal for membrane repairs   -  Flashing roof skylights  -  Seal drain inserts  -  Flash in pipe flanges  -  Curbs or parapets (where flashing heights allow)  -  

Superior ozone and ultraviolet resistance  -  Remains flexible over wide temperature variations  -  Excellent long term weathering qualities

• When installing below 15 degrees, the use of a heat gun (not touching directly), will increase the flexibility & adherence of the flashing. Don't overheat.

Your 9'' Form Flash provides a long lasting seal on your EPDM, typically when flashing over external/outside corners, drains, skylights, & other detailing.

More information can be found in the installation guides, but to summarise:

• Using the Quickscrub Holder & Fleece, apply Quickprime Plus (both sold separately) to the roof membrane and substrate to receive the SA Flashing.

• Allow the Quickprime Plus to semi-cure (user will determine flash off time) until tacky.

• Cut the Flashing to sufficient length, & once the QuickPrime Plus has gone tacky, apply your flashing by removing the tape from one side and smoothing into position. Take care not to crease the flashing or trap any large pockets of air underneath, as these will affect the integrity of the seal.

• Once bonded, use your Silicone Rubber Roller & Penny Roller to work in.

• Once cured after a few hours, Elevate Lap Sealant can be applied to the seam edges.

Note: No contact adhesive is needed for the installation of SA flashing. QuickPrime Plus must be used to prime the membrane to which the flashing will be attached.

When installing below 15 degrees, the use of a heat gun (not touching directly), will increase the flexibility & adherence of the flashing. Don't overheat.

  • Can I stick Elevate Flashing down with bonding adhesive?
    No. You must use Elevate Quickprime Plus to prime the EPDM & surface your seaming product will adhere to. The waterbased deck adhesive or bonding adhesive is not suitable for this.
  • Do I need to seal the edges of the flashing?
    Providing you follow installation instructions, & conduct the work under appropriate weather conditions, the flashing will seam to the EPDM and not require additional sealing. However, during this curing process, Lap Sealant can seal the edges until the seam fully bonds. Our installation team applies this as an extra layer of protection to ensure long-term performance.
  • Can the flashing be stretched?
    Yes, Elevate Quickseam flashing can stretch to allow its application. Do note, it is not designed to be over stretched. It's flexibility is more directed at allowing 3D moulding around awkward corners & details such as pipework, skylight corners and drains.
  • Can Elevate flashing be used to repair other surfaces?
    Yes, Elevate Quickseam flashing can provide a long-term high performance seal to a range of surfaces. Note, all surfaces must be thoroughly cleaned, dry & free from all debris & foreign bodies. It must also always be used with the Elevate Quickprime Plus.
  • What happens if I get air pockets in the flashing?
    Some air pockets can be gently smoothed out with your Silicone Rubber Roller & Penny Roller. Start from the centre, and work towards the edges. Never start at the edge and work in - as this will trap the pocket. It you have air pockets sufficient to affect the seal - you may need to pierce/cut this & place a new patch over the top.

We strongly advise reading our Deliveries & Returns information, to fully understand the delivery of your item(s). 

To summarise, see below:

Order Processing:

Orders for Flat Roofing Items placed before 12pm midday, are generally processed for dispatch the same day. Orders placed after midday will be processed next day. Orders placed on bank holidays or weekends will be processed the next working day. A member of our team will update you via the contact information provided.

Delivery:

After dispatch, your order will generally be delivered the next working day. Do note, if you order other roofing trims with your items, these may be delivered separately due to the length of the trims & courier service guidelines.

The delivery of your items will be carefully packaged, signed off, & will be delivered via a courtier network. We strongly advise being present for delivery to inspect your products & sign delivery notes. Additionally, not all courier service trucks have tail lifts, or pallet trolleys. Please be prepared with the necessary person(s) to take delivery of your items, necessary for the size of the order. Depending on the size of items ordered, they may be heavy - use proper lifting technique, we cannot be held liable for any personal injury resulting from the delivery or use of the ordered items.

Notes on the delivery of Elevate EPDM:

If you order EPDM with your items, the rubber will be delivered rolled up for ease of transport. As a result there may be some fold creases and wrinkles - this is normal. To remedy this, the EPDM should be laid to rest, or settle, for a minimum of 1 hour. In colder temperatures, the light use of a heat gun (not a naked flame) can be used to settle the rubber. Don't overheat or touch directly.

Starting your project:

We advise not booking in or arranging an installation team to begin works before the goods have been delivered & inspected. Delays or order mistakes are rare, but can happen. We can't be liable for any costs as a result from delayed or incorrect delivery or items.